Cenviro through its subsidiary companies namely Kualiti Alam, Cenviro Services and Cenviro Recycling & Recovery specialize in scheduled waste management from downstream, midstream to upstream activities.

 
 

THE LEADER IN INTEGRATED ENVIRONMENTAL SOLUTIONS

Kualiti Alam owns and operates the only integrated hazardous waste management centre in Malaysia, Kualiti Alam Waste Management Centre (WMC) in Negeri Sembilan. The WMC hold the license to handle 76 categories of 77 scheduled wastes listed under Environmental Quality (Scheduled Wastes) Regulations 2005.

With more than 20 years of expertise and experience, Kualiti Alam continues to offer a comprehensive range of waste management services ranging from analysis, treatment, recycling, recovery, logistics to final disposal of scheduled waste. Based on its focus on innovation and technology development, Kualiti Alam remains to reinforce its commitment to the industry, environment and community; and have been recognised for its excellence with various certifications including MS ISO 9001 :2008, ISO 14001 :2004, OHSAS 18001 :2007, MS 1722: 2011 and ISO/IEC 17025.

All facilities are designed and managed to meet stringent international standards. These facilities have the capacity to store, treat and dispose more than 100,000 tones of all classes of hazardous wastes annually. The end-to-end facilities comprise of Incineration Plant, Solidification Plant, Physical & Chemical Treatment Plant, Secured Landfill and Clinical Waste Treatment Centre.


Button_EIWIS.png  Button_WeatherStation.png

Kualiti Alam Waste Management Centre
 

Management Team

 
Terry Biusing
Head Project Management and Operational Excellence
  • Terry Biusing

    Terry Biusing

    Head Project Management and Operational Excellence

    Terry, Head Project Management and Operational Excellence graduated with a Bachelor of Science in Electrical Engineering degree from University of Wisconsin-Madison in 1991. He started his career with Shell Malaysia in 1992, initially gaining operational and supervisory experience in frontline offshore Sabah and onshore Bintulu plant operations. Subsequently, he went through an extensive management and leadership development stint in corporate change management, commercial and finance, corporate governance and internal audit, deepwater project development and execution and supply chain management at various locations in Malaysia including overseas assignment in The Netherlands and United States.

    In 2013, he was seconded into Petronas Carigali Sdn Bhd (PCSB) to be the Chief Operating Officer of its subsidiary company, E&P O&M Services Sdn Bhd (EPOMS) and later joined PCSB in 2014 to put in unbiased and focused attention in business development and operational excellence efforts in EPOMS.

    Upon expiry of his contract with PCSB in June 2016, he assumed the role of Chief Operating Officer with MH Energy Advisors, a new start-up advisory firm responding to the market demand from new ventures, start-ups, and middle market companies in the energy business.

    In May 2017, he joined Cenviro Group subsidiary company, Cenviro Special Builders, which is a special purpose vehicle company to manage all Cenviro Group’s and JV companies projects. He is also responsible to steer Cenviro Group of Companies into an improvement journey to achieve operational excellence.

Idris Sulaiman
Head of Operations
  • Idris Sulaiman

    Idris Sulaiman

    Head of Operations
    Idris Sulaiman, the Head of Operations at Cenviro Group, started his carrier with Harris Advance Technology back in 1996 after graduated from University Technology of Malaysia. He subsequently advanced his maintenance, management & safety skills with couple of companies including Motorola Sdn. Bhd. and MARDEC Processing Sdn. Bhd.

    He holds Diploma in Electrical Power Engineering & Degree in Technology Management.

    In 2014 he was specifically challenged by management of Kualiti Alam Sdn. Bhd. to take lead in harmonizing the Operation, Maintenance and Engineering Department which synergized under OEM Division.
Kamarul Mohd Suki
Head of Marketing - Scheduled Waste Logistic & Packaging
  • Kamarul Mohd Suki

    Kamarul Mohd Suki

    Head of Marketing - Scheduled Waste Logistic & Packaging
    Kamarul Mohd Suki, Head of Marketing (Scheduled Wastes, Logistics and Packaging) holds a B Sc degree in Electrical Engineering from University of Texas, USA. Previously, he held various management positions at General Electric, B Braun Medicals and UMW. He was also a General Manager at Mardec Berhad, an integrated rubber and polymer company; where he was appointed director for various Mardec subsidiaries and alternate director for Malaysian Rubber Board and RISDA.
Amirul Bahri Malek
Head of Marketing - Clinical Waste & Environment Support Services
  • Amirul Bahri Malek

    Amirul Bahri Malek

    Head of Marketing - Clinical Waste & Environment Support Services
    Amirul Bahri Malek, Head of Marketing, Environment Support Services and Logistics, is responsible for providing advisory, sampling, packaging, transportation, treatment and disposal of scheduled wastes including recycling and recovery of selected scheduled wastes. He holds a Master of Arts in Chemistry from University of Oxford, United Kingdom.

    Amirul Bahri joined Faber Medi-Serve Sdn Bhd in 1996 and attached to the clinical waste department. His was then promoted as Head of Cleaning and Waste Management Operations overlooking the service delivery for 72 government hospitals.

    Amirul Bahri then left to join Cenviro in 2009 as Senior Manager of Business Development, focusing on municipal solid wastes, clinical wastes and recyclable wastes. Subsequently in January 2014, he was promoted as Head of Marketing.
Muhammad Fauzan Baharudin
Head of Security, Safety, Health, Environment, Fire & Hazmat
  • Muhammad Fauzan Baharudin

    Muhammad Fauzan Baharudin

    Head of Security, Safety, Health, Environment, Fire & Hazmat
    Muhammad Fauzan Baharudin, Safety, Health & Environment Manager at Cenviro Group is responsible for developing and managing the overall Occupational Safety and Health (OSH), Industrial Hygiene (IH), Environmental as well as Fire & Hazmat Safety aspects in Cenviro Group.

    He has 7 years of professional experience in the area of Safety, Health and Environment in various industries in Malaysia. He is a registered Safety and Health Officer (SHO) with Department of Occupational Safety and Health (DOSH) and a trainer by invitation for National Institute for Occupational Safety and Health (NIOSH). He has also served Universiti Malaysia Pahang (UMP) as an academic advisor for their Occupational Safety and Health Degree program.

    Prior to joining Cenviro Group, he was the Health and Safety Manager of Supply Chain in Lafarge Malaysia Berhad, where he managed operational Health and Safety aspects for transportation of raw materials to countrywide plants and finished products to countrywide customers by road, rail and sea. Under his leadership, Lafarge achieved 100 million kilometers without fatality and LTI in all Supply Chain operations in a span of 3 years. Lafarge global wide came to Malaysia to learn on Lafarge Malaysia’s initiatives introduced which includes Lafarge Drivers’ Safety Passport and Driver Safety Behaviour Change progam. Previously, he served as Safety and Health Officer at Felda Global Ventures (FGV) and Technical Executive at Proton Holdings Berhad.

    Fauzan holds a Master’s Degree in Occupational Safety and Health Management from Universiti Utara Malaysia (UUM) and Bachelor in Mechatronic Engineering from International Islamic University Malaysia (IIUM).
Alex Hoi
Head, Procurement
  • Alex Hoi

    Alex Hoi

    Head, Procurement
    Alex Hoi Kok Pu, Senior Procurement Manager of Cenviro, is responsible for procurement processes, to ensure good quality and timely delivery of required resources at cost-effective pricing and meeting the company’s budget plan.

    Alex holds a Bachelor Degree in Business Administration from University Malaya, Kuala Lumpur.

    Alex has 18 years of working experience in companies of Automotive, Hospitality & Property. He has held Procurement / Purchasing Manager positions and among companies he has served include Proton Edar Sdn Bhd, UOA Hospitality Sdn Bhd and Goldis Berhad.

    His portfolio includes procurement management for new / renovated show room and service centre nationwide, new hotel and office tower project.
Faridah Ab Ghani
Senior Manager, Human Resources and Administrations
  • Faridah Ab Ghani

    Faridah Ab Ghani

    Senior Manager, Human Resources and Administrations
    Faridah AB Ghani, Senior Manager, Human Resources and Administrations is responsible in spearheading the HR initiatives, managing strategic, tactical and overseeing the operational HR & Administration.

    Faridah graduated from University Malaya, Kuala Lumpur with a degree in Economics, majoring in Analytical Economics. She obtained her Diploma in Business Studies, majoring in Marketing from University Technology MARA, Shah Alam, Selangor.

    Faridah has 20 years of working experience in few area including Human Resources & Administration, Procurement, Accounts & Projects with few industries e.g; Aquaculture, Oil & Gas, Constructions and Manufacturing.

    Her Human Resources’ scope includes guides and manages the overall provision of Human Resources services, policies, and programmes for the entire company.

Services & Facilities

As the first integrated waste management centre, the centre is equipped with three incinerators – INC 1 and INC 4 were designed and built by Kualiti Alam. Our third plant, Scheduled Waste to Energy (SWTE) is currently under construction and is scheduled to be completed by October 2017.

The Incineration Plant for scheduled waste is built to cater for all organic waste that requires thermal treatment to achieve maximum destruction efficiency. Scheduled organic waste, including toxic, hazardous, clinical and pathological waste in all forms, solids, sludge and liquids are treated here. A rotary kiln as the primary combustion chamber with a temperature of up to 1000°C and secondary combustion chamber operating at above 1000°C to ensure the highest possible destruction efficiency, followed by heat recovery system and finally an extensive multi-stage flue-gas treatment system.

Designed with multiple feed streams, dual combustion chambers, rapid cooling, dry and wet scrubbing systems, the plant is designed to achieve 99.99% destruction and flue-gas removal efficiency. Emissions from this plant meet all Malaysian Environmental standards. The incineration process is being monitored by Continuous Emissions Systems (GEMS) in order to ensure the compliance with Department of Environment, Malaysia (DOE) license condition. Fully computerised and equipped with continuous monitoring systems, the Incineration Plant represents the latest standard in rotary kiln incineration technology. 
Stabilisation and solidification aim to immobilise the toxic constituents of hazardous wastes to prevent them leaching from the wastes once disposed. The Solidification technologies are often used to treat the residues from other treatment processes such as fly ash from incineration or sludges from heavy metal precipitation. Cement, lime and sand are also used in the solidification process. Solidification technologies are effective in treating a variety of difficult to manage inorganic wastes.

At Solidification Plant, inorganic wastes that are typically metal hydroxide sludge containing heavy metals such as lead, arsenic, nickel, zinc and chromium which do not fulfil the Direct Landfill Waste Acceptance Criteria for direct disposal into Secured Landfill are treated. This Plant can be used for wastes containing mixtures of contaminants and can economically treat large waste volumes.
Physical & Chemical Treatment Plant (PCT) is capable of handling all types of inorganic liquid waste such as acid, alkaline, oxidizer, chromate, cyanide and others. The PCT is also able to handle wastes with high total dissolved solid content through the use of a proprietary treatment process. These wastes are treated through various chemical processes including neutralisation, oxidation and reduction.

The PCT is operated with an intelligent monitoring control system to minimise the potential hazards. This facility allows the treatment of contaminated acids and alkalines, various waste waters and spent plating solutions. The slurry and filtered press sludges are tested periodically to ensure all wastes are treated in a safe and cost effective manner.

ECO-FRIENDLY MICROWAVE STERILISATION SYSTEM

Kualiti Alam offers the most innovative technology in medical waste disposal, AMS-serial 250-Ecosteryl. It is a zero emission technology, no harmful effects, no water, no steam, no odour, no burning or smoke, and is capable to process up to 300 kilogramme per hour. The residue from the process is inert and landfill ready.

The Microwave Ecosteryl is manufactured by AMB-Ecosteryl, a specialist in the commercial treatment of medical waste without combustion. Kualiti Alam is also the distributor for this revolutionary technology to the region, including Thailand, Indonesia, Singapore, Turkey and Brunei.

Advantages & Key Features

Advantages & Key Features

Continuous - Process Flow

Continuous - Process Flow
Kualiti Alam Clinical Waste Treatment Centre
Kualiti Alam Clinical Waste Treatment Centre
In 2015, the existing secured landfill at the WMC was close to full capacity. We had a major problem of finding adequate space for incoming waste.
 
We then conceptualized a strategic vision to create more air space at our existing landfill. The Vertical Secured Landfill Project was born and construction commenced in March 2015.
 
Over the next four years, a 24m high geogrid wall will be built along the 1.7km parameter of our existing secured landfill. This first phase (Phase 1) will provide additional capacity of 1.5 million MT and increase the lifespan initial by 15 years without using new land.

Vertical Secured Landfill
 

What is Geogrid Wall?

  • A green wall works as soil reinforcement
  • Flexible, fast and easy to construct
  • Structure designed for durability
  • Better resistance to dynamic characteristics
  • Using existing space no new land
  • 30 years of landfill on the same land

Effluent Treatment Plant  (ETP)

Kualiti Alam Waste Management Centre (KAWMC) has two facilities to treat wastewater generated in daily operation of treatment and disposal of Scheduled Waste. Effluent Treatment Plant (ETP) is built to treat contaminated surface runoff from operation area and effluent from scheduled waste treatment process. The process is combination of physical-chemical treatment, biological treatment and has capacity of 300m3/day. The ETP plant is also equipped with Ultrafiltration/Reverse Osmosis polishing system to ensure treated effluent consistently meet Standard A limit as stipulated in Industrial effluent Regulation 2009.

Leachate Treatment Plant (LTP)

Leachate from Vertical Secured Landfill is treated by other dedicated plant called Leachate Treatment Plant (LTP). This plant has treatment capacity of 400m3/day and run more complex process than ETP plant. LTP has two stage of biological treatment to remove ammonia and organic contents. Advanced Oxidation and Carbon Adsorption process to further reduce organic contents and finally Ultrafiltration/Reverse Osmosis polishing system to achieve Standard A. Treated effluent and treated leachate from both plants will be reuse as quench water in Incineration Plants.